The creative coworking centre responds to the lack of places for work, creativity and exchange in Obolon, a densely built residential district of Kyiv. The site lies near Heroiv Dnipra metro station, within reach of major transport hubs and between housing, shops and the green spaces along the Dnipro. This location sets the stage for an active public centre at district scale.
Creative coworking centre
Bachelor thesis
“I saw the angel in the marble and carved until I set him free.” — Michelangelo
- Place
- Kyiv, Ukraine
- Year
- 2023
- Type
- Individual study project
Context
A place for work and exchange in Obolon
- 4
- blocks, linked by a passage
- 3–4
- storeys, plus up to two basement levels
- > 80 m
- building length, divided by a movement joint
- 168
- parking spaces, 102 of them in the two-level underground car park
- 600 m
- to Heroiv Dnipra metro station
Obolon
Obolon is one of the oldest settled areas of Kyiv: finds go back to the 4th millennium BC, and the lowland appears several times in the chronicles of Kyivan Rus. Because the bank flooded regularly, houses here stood on stilts early on.
Today’s residential district was built in 1973–1982 on reclaimed floodplain; to protect it from floods, the shoreline was raised by 4–5 m. It is shaped by 9- and 16-storey housing blocks in honeycomb-like microdistricts. The site sits at the end of Obolonskyi Avenue, where the district meets rows of garages, a metro depot and the green spaces along the Dnipro.
Access
| Heroiv Dnipra metro (blue line) | 600 m |
|---|---|
| Regional bus station | 400 m |
| Verbliud bay of the Dnipro | 600 m |
| Dnipro riverbank | 1.5 km |
Analysis
Site analysis, begun in 2023, recalculated in 2026
The analysis was made in 2023 with the early AI tools available at the time, to speed up the work and extend the evaluation of open geodata. For this portfolio it was recalculated in 2026 with current tools and extended by further layers.
Concept
Specialised volumes, linked by a passage
The building is meant not only as a workplace but as part of everyday life in the neighbourhood: it also draws residents into cultural, educational and social events. The design was shaped by the high groundwater level, the nearby technical and transport infrastructure, and the balance between an open building and a quiet residential neighbourhood. Particular attention went to sound insulation, sunlight and the visual effect on the surroundings.
The design brings different creative uses together in specialised volumes with a clear inner structure. A public passage connects them as the main circulation axis and social heart, linking exhibition, recreation and circulation areas. The result is not just an office building but a flexible, adaptable structure and, in the long run, a sub-centre of the district.
Massing 1 / 8 The long, narrow site between the road and the railway
Four workshops under one roof
Each block has its own focus: working with volumes and materials, audio and video recording, fine art. Each gets its own stair and lift core, its own sanitary risers and its own areas to eat and rest; the passage links them with exhibition spaces, stages and waiting areas, so that no dead space remains.
Two construction phases
The building is divided so that it can be built in two phases: the first phase works on its own, the second connects through the passage.
Plans
Ground floor with outdoor areas, and upper floors
Detail
Sections and construction
Structurally, the building rests on pile foundations, in response to the high groundwater level and the soil conditions. A movement joint divides the long volume into independent sections and minimises stresses from uneven settlement. Fire protection includes lobbies in the circulation cores and a clear division into fire compartments.
Structure
- Monolithic reinforced-concrete frame, braced by the stair and lift cores
- Columns 30 × 30 cm, grid 9 / 9 / 12 m across and 7 bays of 6 m lengthwise
- Flat slabs 22 cm, thickened at the columns, for spans over 9 m
- Storey height 3.80 m, 2.40 m in the car park
- Accessible roof terraces on a reinforced slab
- Movement joint between blocks 2 and 3 over the full height; at the passage bridges, fire curtains drop in case of fire
Façade build-up
Rainscreen façade on self-supporting masonry, from outside to inside:
Energy
A building that keeps working during outages
The building is connected to the city grids. Because water and power supply in the district are unreliable (old pipes, poor water quality, the attacks on the energy infrastructure), it also gets its own independent sources.
- 250 solar panels, estimated at about 90,700 kWh a year; surplus fed into the grid at the feed-in tariff
- Inverters and batteries bridge grid outages; a diesel generator is the last reserve
- Passive house principles: airtight envelope without thermal bridges, main surfaces facing south and west, multiple glazing
- Ventilation with heat recovery (MVHR), which also provides base heating
- A well as a second water source, with pumps, filters and its own hot water supply
Images
Images of the building
Inside, a bright Scandinavian feel: lots of glass for daylight, open, step-free plans, natural materials such as wood, stone, glass, ceramics and brick, with a few strong accents from art and exhibitions. Outside, a warm, multicoloured palette of yellow, red, orange and grey, full of contrast but not loud.