← Building directory 1. OG 1st floor

Rebuilding a youth sports school

Steel Freedom · YSA, Youth Sport Academy

“Form follows function – that has been misunderstood. Form and function should be one, joined in a spiritual union.” — Frank Lloyd Wright
Place
Irpin, Ukraine
Year
2023
Type
Team competition, developed further on my own
Structure
Steel frame, BIM model LOD 300
Rendering of the Youth Sport Academy with the climbing wall on the main façade

Background

A sports school after the occupation

On 24 February 2022 Russia launched its full-scale invasion of Ukraine. Irpin and neighbouring Bucha, suburbs north-west of Kyiv, were on the front line and under occupation for weeks; Irpin was liberated at the end of March 2022. According to an estimate by the Kyiv School of Economics, almost half of the town’s buildings were damaged, about 2,500 of them destroyed or badly damaged. According to Ukrainian figures, more than 1,400 people were killed in Bucha and the surrounding district.

The children’s and youth sports school at 40 Troitska Street was damaged as well. The student competition Steel Freedom 2022 asked for a new steel building to replace it: more space for more sports, energy-efficient, with a shelter in the basement.

Sources: Kyiv School of Economics, 2022; Hromadske, 2023.

before The sports school before the war, street view
2022 The same single-storey building after the occupation, burnt-out windows
before The two-storey school building before the war
2022 The two-storey building after the occupation, courtyard with rubble
Before: Google Street View, 2019. 2022: photo documentation from the Steel Freedom competition brief.

Context

A lot of sports space on a tight site

The design began as a team competition entry; afterwards I revised and developed it further on my own. The task was to fit as much usable space as possible into the permitted footprint without the building looking massive. The answer is an articulated volume with a clear hierarchy of functional areas: compact, yet full of movement.

Location plan: Kyiv and Irpin, the site of the sports school
Location plan, Irpin

From the competition brief

750
children and 30 coaches in the daily life of the school
≈ 2,000 m²
buildable area, three storeys at most
8,787 m²
site with football, basketball, tennis and volleyball courts
UG
wrestling hall that doubles as a shelter

The brief asked for a steel frame using as many hollow sections as possible, long-span roofs over the halls, composite slabs on profiled sheet and façades with as much metal as possible. Access from the west via Troitska Street.

Concept

Three layers: outdoor areas, structure, envelope

The central element is the three-storey climbing wall behind a safety net. It is the accent of the main façade and the landmark of the school, which was named YSA – Youth Sport Academy.

The plans strictly separate clean and dirty routes and keep athletes, staff and visitors apart; every area is step-free. The accessible roof holds a pitch for basketball and football and so adds another sports level to the tight site.

Scroll to pull the three layers apart.

Exploded axonometry, layer Envelope Envelope
Exploded axonometry, layer Structure Structure
Exploded axonometry, layer Outdoor areas Outdoor areas
The “rock”
A central projection divides the façade and carries the bouldering and climbing wall. A net and safety ropes make it safe to use; in winter and summer a tarpaulin can be stretched over the outer frame.
Façade
A dynamic envelope of aluminium façade panels (Metipol); gables and bays on the main façade form a sheltered forecourt that welcomes visitors and pupils.
Open to the city
Rooms on the ground and first floors can also be rented out for public uses, which makes the school financially more independent.
Outdoor areas
A grandstand sits like an island between the pitches and doubles as a meeting point; the path around the pitches is also a running track.
A · Climbing wall
B · Daylight through light tubes (up to 600 mm)

Light tubes bring daylight into the interior changing rooms.

Plans

Separate routes, a shelter in the basement

Ground floor plan
First floor plan
Second floor plan
Basement plan

Everyday Sports and plant rooms
Air raid alert Shelter with its own entrance and self-sufficient operation

Structure

Steel frame, worked out as a BIM model

As the competition required, the structure is a steel frame, braced by the stair and lift cores. It was worked out as a BIM model at LOD 300; the calculation was coordinated with a structural engineer.

  • Columns and beams of I-sections; between them channel sections carry the composite slab on profiled sheet
  • Castellated (perforated) beams: lighter, with less steel, and the services run through the openings
  • Passive house principles and 90 solar panels on the roof, about 30,000 kWh a year, also for charging points in the car park; surplus fed into the grid
Joints: column base, bracing, beam-to-column connection
Sectional axonometry from the BIM model (Archicad)

Detail

Sections and joints

Façade section 2-2
Detail 1 · Column base
Detail 2 · Bracing connection
Detail 3 · Beam-to-column connection
Section 1-1 with interior view